LNER runs no trains to Harrogate on Christmas Eve, and nothing runs on 25 or 26 December. Last LNER train from Leeds to London on New Year's Eve: 18:10.
There will be no trains from Harrogate, Knaresborough or anywhere else on Christmas Day, and very few anywhere on Boxing Day. Trains will also finish early on Christmas Eve and New Year’s Eve. The train companies have not yet published their 2026 festive timetables, and Network Rail has not yet listed its Christmas engineering work, so this page sets out what is fixed now and when the rest arrives.
Updated 2 November: LNER and Northern have now filled in 27 and 28 December and New Year’s Eve. On New Year’s Eve the last LNER train from Leeds to King’s Cross is the 18:10, and the last from King’s Cross to Leeds is the 20:40.
Updated 19 October: LNER now says it will run no trains to Harrogate on Christmas Eve, and both LNER and Northern have confirmed no trains at all on Saturday 26 December.
Updated 5 October: Northern has confirmed its Christmas Eve finish, and Network Rail has closed all lines through Doncaster on Christmas Eve, which hits LNER journeys home from London. Both are added below.
Overview
- Christmas Eve (Thursday 24 December): no LNER trains to Harrogate. Change at Leeds or York for Northern.
- Friday 25 December: no National Rail trains at all. Saturday 26 December: no Northern and no LNER trains, so nothing at all runs on the Harrogate line.
- Christmas Eve: no trains through Doncaster either. LNER will run King’s Cross to Retford and York northwards, with coaches in between. Northern trains may be cancelled from 6pm, and most are withdrawn by 8pm.
- New Year’s Eve (Thursday 31 December): early finish. Last LNER trains: 18:10 Leeds to King’s Cross and 20:40 King’s Cross to Leeds. Northern trains may be cancelled from 6pm, with most withdrawn by 8pm.
- Sunday 27 December: the 07:58 York to King’s Cross does not run; an extra LNER train leaves Leeds for King’s Cross at 08:04.
- Monday 28 December, the substitute Boxing Day bank holiday: neither LNER nor Northern lists any change on the Harrogate line or between Leeds, York and London.
Christmas Eve: Doncaster closed, Northern finishes early
National Rail lists engineering work closing all lines between Retford and York on Thursday 24 December. There will be no trains at Doncaster that day. For anyone coming home to Harrogate from London, this is the one that matters:
- LNER will run trains from King’s Cross to Retford or Lincoln, and from York northwards
- coaches will run non-stop between Newark North Gate or Doncaster and York
- coaches will also run from Retford to Leeds, calling at Doncaster and Wakefield Westgate
- Northern trains between Leeds and Doncaster will not run
The Leeds to Harrogate to York line itself is not listed as affected. The problem is getting to Leeds or York from the south. Allow much longer, or travel on the 23rd.
LNER’s Christmas page on National Rail now says: “There will be no LNER train services to Harrogate, Bradford Forster Square, Skipton, Hull or Middlesbrough” on Christmas Eve. So the direct trains to and from King’s Cross do not run that day. Travel via Leeds or York and change to Northern, allowing for the Doncaster closure above.
Northern’s Christmas page on National Rail says that on Christmas Eve trains “may be cancelled or terminated short of their usual destination” from 6pm, “with most services withdrawn by 20:00”. Northern runs every stopping train between Leeds, Harrogate, Knaresborough and York.
Boxing Day and the weekend after
Both operators have now filled in Saturday 26 December:
- Northern: “No Northern trains will run on Saturday 26 December.”
- LNER: “No LNER trains will operate on Saturday 26 December.”
On Sunday 27 December Northern says trains “may be cancelled or start later than normal” until 8am. Its only engineering change listed that day is between Manchester and Leeds via Bradford Interchange, not on the Harrogate line.
LNER’s page now lists its changes for Sunday 27 December:
- the 07:58 York to London King’s Cross will not run
- an additional train will run from Leeds to London King’s Cross, departing Leeds at 08:04
On Monday 28 December, the substitute Boxing Day bank holiday, LNER’s only change is to late trains between Newcastle and Edinburgh. Northern’s changes that day are between Manchester, Huddersfield and Leeds, and late at night around Preston. Neither touches the Harrogate line.
New Year’s Eve: last trains
LNER says the last trains of the day on Thursday 31 December “will be earlier than they usually are on weekdays”. It gives these last services (National Rail):
| Journey | Last LNER train |
|---|---|
| London King’s Cross to Leeds | 20:40 |
| London King’s Cross to York | 20:03 (the Newcastle train) |
| Leeds to London King’s Cross | 18:10 (the 17:37 from Bradford Forster Square) |
| York to London King’s Cross | 21:04 (the 18:30 from Edinburgh) |
Northern says that from 6pm on New Year’s Eve trains “may be cancelled or terminated short of their usual destination, with most services withdrawn by 20:00” (National Rail). So if you are coming back from London on the 20:40, check that a Northern train will still be running from Leeds to Harrogate when you arrive.
What National Rail has confirmed for 2026
National Rail’s Christmas and New Year 2026/27 travel summary sets out the national pattern:
| Date | What National Rail says |
|---|---|
| Thursday 24 December | Trains on many routes finish earlier than normal; do not assume the normal timetable |
| Friday 25 December | No National Rail services |
| Saturday 26 December | Most operators run no service; a very limited service by a small number of operators, details to be confirmed |
| Monday 28 December | Substitute bank holiday for Boxing Day; services to be confirmed |
| Thursday 31 December | Trains on some routes finish earlier than normal |
| Friday 1 January 2027 | Extra late-night services are London area routes only |
It says each train company’s festive details will be added “from the beginning of October onwards”, and that its guide to the last trains out of London on Christmas Eve will be published in late November or early December. That guide matters if you are coming home to Harrogate on LNER’s direct service or changing at Leeds or York.
National Rail has already flagged one major closure: Birmingham New Street has engineering work from Thursday 24 to Monday 28 December, and journeys to, from or through it will be “significantly disrupted”. That matters if you are heading to the Midlands or the south-west.
What Northern did last Christmas
Northern runs every stopping train between Leeds, Harrogate, Knaresborough and York. Its travel advice for Christmas 2025, published on 18 December 2025, said:
- On Christmas Eve, “services will end earlier than usual”.
- There were no Northern trains on Christmas Day or Boxing Day.
- From 27 December to the end of January, trains were disrupted between Leeds and York for Transpennine Route Upgrade work.
That release came out only a week before Christmas. Expect the 2026 version on a similar timetable, so book around it rather than waiting for it.
Engineering work between now and Christmas
National Rail lists engineering work about twelve weeks ahead. We checked every planned notice again on 2 November 2026. Apart from the Doncaster closure on Christmas Eve, no notice yet names the Harrogate line over Christmas.
Before then, one weekend is booked around Leeds and York:
- Saturday 14 and Sunday 15 November: buses replace Northern trains between Leeds and York and between Leeds and Selby, and TransPennine trains run via Castleford (National Rail). The notice does not list the Leeds to Harrogate to York line.
Buses and parking
The Harrogate Bus Company, which runs the 36 to Leeds and Ripon and the town services, publishes its Christmas timetable in December. Its 2025 notice is no longer online, so we are not repeating last year’s times. We will add the 2026 times when Transdev publishes them.
North Yorkshire Council has not announced any Christmas parking offer for Harrogate, Knaresborough or Ripon for 2026. For car parks and charges now, see parking in Harrogate. If you are driving to the Knaresborough Christmas market on 5 and 6 December, the organisers run a free park and ride.
Still to be confirmed
- Northern’s and LNER’s full 2026 Christmas timetables beyond Christmas Eve and Christmas Day.
- The last trains out of London on Christmas Eve, due late November or early December.
- Network Rail’s Christmas engineering work on the Harrogate line and the East Coast Main Line.
- Harrogate Bus Company’s Christmas and New Year timetable.
More: trains from Harrogate to London, roadworks and travel, Christmas bin collections and school term dates.
Have your say